Building our New Museum: Construction Diary
May 2022
The Main Entrance to the Museum continues to take shape.
Windows adjacent to the Main Entrance are now glazed.
The Main Entrance and Shop seen from inside the Reception area.
Panoramic windows will greet the visitor when they enter the new Museum Reception.
Looking along the corridor which will connect the Exhibition Spaces and Reception.
The new Exhibition rooms now have a ceiling and are being weather sealed.
Looking across the main Exhibition space.
Windows with views across Kilmartin Glen in the main Exhibition.
The Temporary Exhibition spaces on the ground floor of the Manse continue to be fitted out.
Windows are now installed in the Learning Space.
External view of the windows in the Reception area, which connects the Café with the Manse.
Walling taking shape on the exterior facade of the Exhibition spaces.
An elevated view of the old Manse emerging from the new Exhibition spaces.